Nabiac Borefield Stage 2B Watermain Upgrade

Client
MidCoast Council
Location
Nabiac, NSW
PROJECT OVERVIEW

Supply and install 5500m of DN375 and DN200 PVC pipes to increase the existing water capacity in the area.

 

Scope of Works

Nabiac Borefield Stage 2B Watermain Upgrade

 

Project Challenges/Risks

• Managing deliveries and movement of large quantities of materials over long distances on narrow roads
• Working in sensitive areas with high environmental standards
• Multiple connections to the existing watermain/borefields
• Liaise with different stake holders working on the same area

More Recent Work

Aerial view of a large construction site with two excavators digging soil. The area is mostly cleared with visible vehicle tracks. One tree stands near the excavators, and a white vehicle is parked on the right side of the image.

Nyngan Cobar Water Security

To overcome the challenges of the Nyngan Cobar Water Security Project, we employed a comprehensive strategy, including project planning for efficient task breakdown and resource allocation, and incorporating state-of-the-art technology to ensure that all components...
A tunnel with multiple lanes is filled with cars driving in both directions. Overhead electronic signs display a speed limit of 80 km/h. The WestConnex Haberfield section is brightly lit, and traffic appears to be flowing smoothly.

WestConnex Haberfield

Leveraging our comprehensive expertise in civil engineering, Trazlbat stepped up to the plate to address these challenges. With precision and care, our team managed the elaborate tasks of pipe installation, bore and sleeve operations, and...