Charleston Dam Project

Client
Saunders International
Location
Minchinbury, NSW
PROJECT OVERVIEW

The Minchinbury Elevated Reservoir project in Western Sydney presented a set of complex requirements, including the external installation of MSCL (Mild Steel Cement Lined) pipework through a pump station wall. Additional challenges involved the installation of reinforcement and formwork, as well as concrete encasement.

More Recent Work

Aerial view of a large construction site with two excavators digging soil. The area is mostly cleared with visible vehicle tracks. One tree stands near the excavators, and a white vehicle is parked on the right side of the image.

Nyngan Cobar Water Security

To overcome the challenges of the Nyngan Cobar Water Security Project, we employed a comprehensive strategy, including project planning for efficient task breakdown and resource allocation, and incorporating state-of-the-art technology to ensure that all components...
A tunnel with multiple lanes is filled with cars driving in both directions. Overhead electronic signs display a speed limit of 80 km/h. The WestConnex Haberfield section is brightly lit, and traffic appears to be flowing smoothly.

WestConnex Haberfield

Leveraging our comprehensive expertise in civil engineering, Trazlbat stepped up to the plate to address these challenges. With precision and care, our team managed the elaborate tasks of pipe installation, bore and sleeve operations, and...