The works comprise the rehabilitation of the existing wastewater treatment ponds and the replacement of the existing septic tank system at the site. The project includes dewatering, desludging, earthworks, embankment stabilisation, septic tank decommissioning and replacement, associated pipework installation, testing, commissioning, and site reinstatement to restore the facility to full operational capability.
We acknowledge the Traditional Owners of Country throughout Australia and recognise their continuing connection to land, waters and culture. We pay our respects to their Elders past, present and emerging.
Copyright © Trazlbat PTY LTD 2024 | Privacy Policy
Website by IONYX Digital