Balonne Sewer Treatment Plant Upgrades

Client
Balonne Shire Council
Location
Bollon and Dirranbandi, QLD
PROJECT OVERVIEW
1. Pond Rehabilitation

  • Oxidation Pond 1 (35m x 15m): Dewater, desludge, rehabilitate, and stabilise banks. Extend pond wall near septic tank for minimum 3m clearance. Reuse suitable evaporation pond material for wall construction if applicable.
  • Oxidation Pond 2 (72m x 25m): Dewater, desludge, rehabilitate, and stabilise banks.
  • Evaporation Pond: Clean-out, reshape pond and embankments, and level floor.

2. Septic Tank Replacement

Decommissioning

  • Pump out, remove, and dispose of existing septic tank contents, tank, and associated infrastructure (approx. 4m diameter x 3.3m deep).
  • Dispose of waste at approved facilities.

New Tank Installation

  • Supply and install new septic tank(s) with minimum 42kL capacity in accordance with AS/NZS 1546 and authority requirements.
  • Backfill and compact excavations.

Ancillary Works

  • Connect and test new inlet/outlet pipework for watertightness.
  • Supply and install 150mm inlet/outlet pipework and approx. 6m of 150mm rising main and valves.
  • Provide compliant ventilation and access openings.
  • Reinstate site to pre-works condition.

Testing & Commissioning

  • Conduct watertightness and functional testing.